[Mayan calendar]

Large Program Queue Summary : Semester 2018A GS

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Large Program Queue
Ref #PIPartnerTitleInstrumentHours
allocated
GS-2018A-LP-1BaloghLPThe GOGREEN Survey of dense galaxy environments at 1<z<1.5GMOS-S7.80
Execution Status: completeDates Taken:
20180504 20180509 20180615 20180616 20180617 20180624
Completion Status:
100%
GS-2018A-LP-2FritzLPXProbing the dark halo of the Milky Way with GeMS/GSAOIGMOS-S / GSAOI+GeMS Adaptive Optics40.00
Execution Status:Dates Taken:
20180301 20180302 20180303 20180304 20180316 20180318 20180319 20180806
Completion Status:
51%
GS-2018A-LP-11HsiehLPObservational Characterization of Active Main-Belt Comets and Main-Belt Comet NucleiGMOS-S2.30
Execution Status: completeDates Taken:
20180223 20180316 20180419 20180512 20180615 20180712
Completion Status:
100%
GS-2018A-LP-12MonnierLPScattered Light imaging of YSOs: Probing the Fundamental Stages of Planet FormationGPI20.00
Execution Status: completeDates Taken:
20180202 20180317 20180319 20180321 20180323 20180413 20180520 20180607 20180608 20180609
Completion Status:
100%
GS-2018A-LP-17MaceLPYoung Star & Protoplanetary Disk Evolution with High-Resolution IR SpectroscopyVisitor135.00
Execution Status:Dates Taken:
20180422 20180425 20180427 20180428 20180429 20180502 20180503 20180504 20180505 20180506 20180522 20180523 20180524 20180525 20180526 20180527 20180528 20180602 20180603 20180604 20180605 20180621 20180622 20180623 20180626 20180627 20180628 20180629
Completion Status:
58%
GS Large Program Queue
Ref #PIPartnerTitleInstrumentHours
allocated
GS-2018A-LP-6ChenLPCharacterizing Dusty Debris in Exoplanetary SystemsGPI19.80
Execution Status:Dates Taken:
20180314 20180315 20180317 20180318 20180320 20180708 20180709
Completion Status:
45%

 

[Science Operations home][schedules home]


Last updated on: 7 Jun 2021 12:42:09 GMT

close